Gamesa G128

Gamesa G11X-5.0 MW Cutting edge offshore technology

The advanced technology utilized in the Gamesa G128-5.0 MW assures high reliability, boosts energy production, reduces maintenance, minimizes downtime, and ultimately maximizes the profitability of each project.

www.gamesacorp.com

January-September2011 Results

G128-4.5 MW Type Certificate received. • 4 G97-2 MW prototypes erected and 2 already commis ... robustness of Gamesa’sproduct platform and manufacturing processes. 5.4%

www.gamesacorp.com

OWT-15 PROPOSAL OF A NEW ROTOR CONFIGURATION OF A MULTI-MW ...

... 150 22,686170 83.0 5-8 12.00 Enercon E126, 2007 6,000 131 12,362126 60.0 8-13 __ Enercon E112, 2007 4,500 __ 10,207114 __ 8-13 __ Bard VM, 2007 5,000 90 11,609122 59.4-28.5 11.5 12.50 Multibrid M5000, 2007 5,000 90 10,568116 57.0 5.9-14.8 12.50 REpower 5MW, 2007 5,000 120 12,469126 61.5 6.9-12.0 13.00 Gamesa G128 ...

www.cnwpem.com

Berria

The*turbine's*swept*area,*14,527*m2,* exceeds*that*of*the*G128-4·5*MW*by* 13%*enabling*an*increase*of*up*to*8%* in*annual*energy*output*compared*to* the ... GAMESA launches its new wind turbine, designed for low-wind sites Gamesa G136-4·5 MW Class III turbine.

www.clusterenergia.com

New Design Trends Harnessing the Vision

© 2010 Clipper Windpower, Inc. and subsidiaries • Clipper 2.5 MW Liberty • Acciona 3.0 MW AW-3000 • Vestas 3 MW V112-3.0 • GE 2.5 MW new to the US in 2010 • Gamesa 4.5 MW G128-4.5 • Suzlon 2.1 MW S.88 • Siemens 3.6 MW Direct Drive • Enercon 6 MW E-126 Direct Drive • ...

www.iawind.org

Wind Technology Trends: Why Small Steps Matter

Liquid Cooled In 2008, Gamesa of Spain experienced only limited growth and the company's workhorse remains the 2-MW wind turbine series. However, a prototype of the newest addition to the company's range, the 4.5-MW G128-4.5 MW, has been erected recently at the Cabezo Negro R&D wind farm located in the ...

principlepowerinc.com

Berria Energia - Los Grupos Ormazabal e Ikusi acuerdan crear ...

Gamesa ha presentado en la feria Ener-gy 2011 de Hannover su nuevo aerogene- ... ra en un 13% el de la G128-4,5 MW y consigue un incremento de hasta un 8%

www.clusterenergia.com

Special Report | Sonderdruck - · 45852 · 18. Jahrgang · 25 ...

GAmeSA G90-2.0mw 2000 kW 67 / 78 / 100 m 6362 m² for all hub heights: IEC IIA – GL; IEC IIIA – GL, WZ II Windtest N/S 03/2006 – DEWI 12/2010: 1602 GAmeSA G128-4.5mw 4500 kW 120 m 12868 m² IEC IIA – GL N/S N/S N/S 12/2010: 1

www.wind-turbine-market.de

Other sites you could try:

Find videos related to Gamesa G128