Congoleum

IX. INSTALLATIONOF DURACERAMIC DURACERAMIC OPTIONS AND DURAPLANK

CONGOLEUM UNDERFLOR The all-in-one underlayment system for floating installations of DuraCeramic tile and DuraPlank. Congoleum UnderFlor provides an economical solution for installing DuraCeramic, DuraCeramic Options and DuraPlank as a floating flooring system over a variety of subfloor surfaces.

www.congoleum.com

INSTALLATION AND TECHNICAL GUIDE

CONGOLEUM UNDERFLOR SUBSTRATE RECOMMENDATIONS UnderFlor can be installed over the following surfaces: Congoleum UnderFlor Installation Install Congoleum UnderFlor with the vinyl side down just prior to installation of finished flooring.

www.congoleum.com

FIRST AMENDED CONGOLEUM PLAN TRUST DISTRIBUTION PROCEDURES ...

i DOC# 353974v.4 8/22/2011 FIRST AMENDED CONGOLEUM PLAN TRUST DISTRIBUTION PROCEDURES (effective July 7, 2011) Table of Contents Page SECTION I Introduction..... 1 1.1 Purpose ...

congoleumtrust.com

Notice Regarding Amendments to Congoleum Plan Trust ...

Notice Regarding Amendments to Congoleum Plan Trust Distribution Procedures The Congoleum Plan Trust Distribution Procedures (the "TDP") became effective on July 1, 2010, pursuant to the Fourth Amended Joint Plan of Reorganization Under Chapter 11 of the Bankruptcy Code of the Debtors, the ...

congoleumtrust.com

RESIDENTIAL CARE IMMEDIATELY AFTER INSTALLATION

a Congoleum representative who will review the claim or arrange for inspection of the floor. The normal time period for review or inspection after the claim has been filed with Congoleum is within 60 days.

www.carpetdirect.com

insert sheet/white shield sheet

when excessive moisture or alkaline conditions exist, the installation of congoleum flooring products is not recommended. installation or service failures due to excessive moisture or alkali through concrete subfloors are not the responsibility of congoleum corporation and it does not assume ...

www.loweslink.com

SAFETY

your Congoleum distributor or contacting Congoleum at the address or phone number listed on this page. ■ Various safety precautions should be taken when preparing subfloors.

www.menards.com

PRECEDENT I AL

Congoleum Corporation v. Ace American Ins. Co., 1 et al. , Superior Court of New Jersey, Law Division, Middlesex County, Docket No. MID-L 8908-01.

www.ca3.uscourts.gov

CONGOLEUM CORPORATION

CONGOLEUM CORPORATION 3500 Quakerbridge Road Mercerville, New Jersey 08619 NOTICE OF ANNUAL MEETING TO BE HELD MAY 3, 2010 TO THE STOCKHOLDERS OF CONGOLEUM CORPORATION: Notice is hereby given that the Annual Meeting of the Stockholders (the "Meeting") of Congoleum Corporation (the "Company ...

congoleum.info

FINDINGS OF LAW AND FACT: TRIAL PHASE I

Congoleum argued that the evidence shows that the defendants would have objected to any agreement entered in connection with the prepackaged bankruptcy plan.

online.wsj.com

Other sites you could try:

Find videos related to Congoleum