SUBJECT: FIRST ARTICLE INSPECTION

BALLOONED DRAWING: Engineering ballooned drawing that has each characteristic or requirement clearly marked with unique identifier number.

www.aerojet.com

Production Part Approval Process (PPAP) Requirements

Drawing (as provided by General Fasteners Company) - ballooned drawing corresponding to dimensional results 3. Dimensional Results - 6 pieces ...

www.genfast.com

G.W. Lisk Supplier Training Manual

Ballooned Drawing for all drawings features. 2. A form containing variables data for each coinciding item #, and the type of gages used. 3. Numbered Sample(s) ...

www.gwlisk.com

LORD Corporation Local Operating Procedure

Suppliers are also required to e-mail the FAI form in the original format, a copy of the ballooned drawing, and all material/process certifications to the e-mail address identified below.

www.lord.com

NEPTUNE SERIES 7000 Mechanical "dia-PUMP" MODELS 7100 thru 7200

Ballooned drawing of the pumps can be found on pages (12) and (14). Send all orders or inquiries for parts to: Parts Department Neptune Chemical Pump Company, ...

www.neptune1.com

OPERATING & INSTRUCTION MANUAL

Ballooned drawing of the pumps can be found on pages (12) and (14). Send all orders or inquiries for parts to: Parts Department Neptune Chemical Pump Company, ...

www.neptune1.com

CMC Supplier Requirements Manual

... Submit to a ballooned drawing / numbered print. All dimensions and notes must be numbered and referenced in the submission package. 4) Complete a full sample inspection report.

www.davcotec.com

Supplier First Article Inspection

Engineering Drawings, which will include a marked up drawing (or “Ballooned” drawing) that correlates characteristic number from FAI to the Drawing 2.

www.hawkerbeechcraft.com

TITLE: Production Part Approval

PPAP level 2, 3 & 5 submissions must include at a minimum: · Warrant (Part Submission Warrant (PSW)) · Sample parts · Ballooned drawing ...

supplier.xrite.com

Supplier Day 00, 00, 2007

Can Drawing/ODS/QAP/QAR/SQAP and Specifications be met as ... Process and Test requirements specified as part of the Purchase Order •100% dimensional verification Ballooned drawing shall match inspection report, must include notes and PO clauses •Final Inspection/Test Reports •Control ...

www2.l-3com.com